Solar Farm Working Group
BOARD/COMMITTEE: Solar Farm Working Group
DATE: July 26th, 2023 3:00 pm
LOCATION: Joint meeting with Select Board, details below:
LOCATION: Town Hall Annex (Large Room) & Virtual
Please join my meeting from your computer, tablet or smartphone. https://meet.goto.com/727712397
You can also dial in using your phone. Access Code: 727-712-397 United States: +1 (571) 317-3112
Join from a video-conferencing room or system. Meeting ID: 727-712-397
Dial in or type: 67.217.95.2 or inroomlink.goto.com Or dial directly: 727712397@67.217.95.2 or 67.217.95.2##727712397 Get the app now and be ready when your first meeting starts: https://meet.goto.com/install
REQUESTED BY: Richard Chase
______________________________________________________________________
“The listings of matters are those reasonably anticipated by the Chair 48 hours before said meeting, which may be discussed at the meeting.~ Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.”
LIST OF TOPICS TO BE DISCUSSED
- Discuss next steps with Select Board
o PMLD to Sterling Interconnection update
o Phase 1, landfill RFP
- Who will draft?
- Who will review?
- Other considerations?
- Public Questions and Comments
Action items:
o CBH, RC Collect information for RFP, samples, details
o RC Collect information for options for RFP
UPCOMING MEETINGS MEETING/EVENT EST. TIME LOCATION
o Aug 17th PSF regular mtg 10:00 am Virtual
Active members:
RC Richard Chase
JG Jennifer Greene
CBH Corey Burnham-Howard
JM John Mirick
HL Helga Lyons
BH Bonnie Hirsh
Advisors:
HT Helen Townsend
LG Larry Greene BK Brian Keevan
SP Sherry Patch
TL Terri Longtine
VT Victoria Taft RB Richy Bisk
7/15/2023
Items for Project:
Can DCR land be incorporated into project scope, Not for phase 1 due to timing
· Lease issues
· Article 97 required, potentially yes.
Post Closure Use Permit
· How much can PSF, Town and PMLD do to minimize consultant costs. PSF to do as much as possible on a volunteer basis
· Feasibility Study preparation by PSF with input from Town/ PMLD
Town vs PMLD roles
· ATM warrant article draft
· Who is to issue the RFP (Town)
PMLD
· Nextera Contract implications
· Interconnection implications
RFP process
DCR land research update Acres Percent
· Commonwealth of Mass 3929 17.12%
· DCR 3348 14.59%
· State in Total 7277 31.71%